Tile and stone,
installed right.

Family-run installation crew specializing in marble baths, porcelain floors, and custom showers across Miami-Dade and Broward.

Request Estimate

Built by hand, leveled by eye, finished without shortcuts.

JM Tile Solution has spent the last decade setting tile, porcelain, and natural stone inside homes and new builds across Miami-Dade, Broward, and West Kendall. Every slab is checked for vein direction before it's cut. Every shower pan is sloped and tested before the glass goes up.

We work direct with homeowners and general contractors, not through layers of subcontractors, so the person who quotes the job is the person who shows up to set it.

What we install.

Marble vanity and natural stone shower wall

Marble & Natural Stone

Marble vanity tops, slab showers, and natural stone floors, fabricated and set with mitered edges and book-matched veining.

Large-format tile being set in a Miami kitchen

Tile Installation

Ceramic and large-format tile for kitchens, entryways, and outdoor living spaces, set on waterproofed substrates.

Custom curbless shower with frameless glass

Custom Showers & Bathrooms

Curbless shower pans, niche details, and frameless glass prep, built to drain right the first time.

Large-format porcelain plank flooring in a new construction living room

Porcelain Flooring

Large-format porcelain plank and slab flooring for new construction and renovation, laid flat with minimal lippage.

Direct line to the person doing the work.

No call center, no rotating crew. You text the owner, the owner answers, and the same hands that walked your floor are the ones setting it.

JM Tile Solution crew on a Miami construction site

Material-first quoting

We measure and check material lead times before we quote, so the schedule we give you is the schedule we keep.

Built for Miami construction

Humidity, slab moisture, and hurricane-grade waterproofing are part of every shower and floor we set, not an upcharge.

How a project moves.

  1. Consult

    We walk the space with you and talk through material, layout, and timeline.

  2. Estimate

    A written estimate with material costs, labor, and a real install date, no surprises later.

  3. Install

    Your crew preps, waterproofs, and sets the job start to finish, with daily site cleanup.

  4. Walkthrough

    We walk the finished space together before we call the job done.

From Miami homeowners.

They re-sloped our shower pan before tiling because the old one was holding water. Nobody else who quoted us even checked.

Daniela Restrepo,
Coral Gables

Our porcelain floors run forty feet without a single lippage edge you can feel. That's rare.

Marcus Whitfield,
Pinecrest

JM matched the marble veining across three vanity slabs. It looks like one continuous piece of stone.

Renata Albuquerque,
West Kendall